Wastewater Engineering Construction Permitting Manual
The Missouri Department of Natural Resources Wastewater Engineering Construction Permitting Manual for Facilities with a Design Flow of 22,500 gpd or Greater is a tool designed to guide review engineers through the process of wastewater system construction project review. This manual is available to the public with the intention of providing insight into the process and methods used by the department to issue wastewater construction permits. The appendix includes the checklists and department memos referenced in the manual.
Manual
Appendix
- Communication and Coordination with Permit Applicants, Permittees and the Public Memo
- Interim Procedure on Affordability Memo
- No-Discharge Domestic Permit Exemptions Memo
- Incomplete Permit Applications Memo
- Revised Application Tracking and Statutory Deadlines for Permit Issuance Memo
- Supervisory Registered Professional Engineer Contacts within MoDNR Memo
- SRF and State Direct Loan Specification Checklist
- Forty Percent Specification Checklist
- Small Borrower Loan Specification Checklist
- Rural Sewer Grant Specification Checklist
- STAG Specification Checklist
- Change Order Review Checklist Non-Funded
- Change Order Review Checklist Funded
- Design of Gravity Sewers Checklist
- Gravity Sewer Spreadsheet XLS
- Leakage Tests for Sewer Systems Memo
- Review of Sewer Extensions Letter
- Revision to Sewer Extension Review Process Memo
- Reduction of Reviews for Entities with an Approved Permit Program for Sewers Memo
- New Technology Policy Implementation Memo