Construction photos from March 22, 2004, click on
photo to see larger image.
Main entrance ramp.
Bicycle storage area under main entrance map..
Brick facing of east wing stairwell.
First floor conference area with
windows installed.
Rear east wing, northern aspect with atrium steel work being
erected.
Northern aspect, west wing.
Components of the high-efficiency "right-sized" HVAC
system installed, first floor west wing. This system will give
each employee control over their office environment and the
standard will exceed American Society of Heating, Refrigeration
and Air Condition Engineers specification.
Installation of mechnical systems, first floor west wing.
Loading dock area, west wing.
Silt fence to prevent soil erosion
and runoff from site.
After recent heavy rains, the fences
have proven their worth.