[
Skip all navigation
]
Divisions and Programs
Energy Center
EIERA
Environmental Quality
Air Pollution Control
Hazardous Waste
Land Reclamation
Solid Waste Mgmt.
Water Protection
Field Services
Regional-Satellite Offices
Environmental Services
Geology and Land Survey
Administration
Geological Survey
Land Survey
State Parks and Historic Sites
State Historic Preservation
Water Resources
Soil and Water Conservation
Home Page
Site Directory
Help
Forms and Permits
Publications
News and Public Notices
State Parks
Calendar
Search DNR
site
state
Lewis and Clark State Office Building
Formerly Named Green Office Building
Construction photos from July 12, 2004, click on photo to see larger image.
Parking lot retaining wall looking north towards building.
Close-up of pouring concrete for retaining wall.
Eastern section of parking lot retaining wall.
The pumps for the chilled water system located in the main mechanical room on the first floor west end.
Due to the compact site footprint, our main contractor has to keep things neat and tidy at the base of the water tower.
This is no mistake. The gap shown between the column and floor is deliberate and part of the building seismic protection.
Natural light is reflected from the ceiling tiles in one of the internal offices.
Retaining wall disects power and telephone feed to Web camera tower, taking the camera offline temporarily. It should be back up after July 21.
View from atrium looking northeast.
Northern aspect of the atrium.