Skip all navigation
]
Divisions and Programs
Energy Center
EIERA
Environmental Quality
Air Pollution Control
Hazardous Waste
Land Reclamation
Solid Waste Mgmt.
Water Protection
Field Services
Regional-Satellite Offices
Environmental Services
Geology and Land Survey
Administration
Geological Survey
Land Survey
State Parks and Historic Sites
State Historic Preservation
Water Resources
Soil and Water Conservation
Home Page
Site Directory
Help
Forms and Permits
Publications
News and Public Notices
State Parks
Calendar
Search DNR
site
state
Lewis and Clark State Office Building
Formerly Named Green Office Building
Construction photos from Oct. 8, 2004, click on photo to see larger image.
Caulking windows on the third floor, west wing.
Painting the atrium.
Entrance ramp guardrails being installed.
Cleaning roof before installation of photovoltaic cells (solar panel).
Self adhesive photovoltaic cell panels which will eventually produce 2.5 percent of the building's electrical load are easily installed.
Weatherproof connections from panels route wiring to control systems.
Taking advantage of the warm dry weather, final window glazing has taken place.
First floor atrium area preparation for final window glazing.
Northern aspect (rear of building), west wing.
View to north with retention pond in foreground.
Final grading of the visitor and disabled parking lot.