Missouri Department of Natural Resources fact sheet
Missouri Department of Natural Resources Director: Kurt U. Schaefer
PUB0541

In Missouri’s active business climate, it is not unusual for firms to change ownership. We at the Missouri Department of Natural Resources are made aware of scores of ownership changes each year. It is often the case that environmental permits held by the seller may be directly transferred to the buyer without going through the entire permitting process again. However, since ownership change is not a routine occurrence for most companies, there are not many people familiar with the procedures for transferring ownership of environmental permits. This publication is to help the buyer and seller answer many of the initial questions and smooth the overall transfer process.

Specifically, this publication will give information and guidance on which permits can be transferred, the nature of information required, public notice requirements, forms, fees, timing and who to contact. This publication is not intended to replace personal contact with the department, but it will help buyers and sellers early in the process with the information needed to assure continuity of environmental permits.

The publication is set up as a series of tables, each table covering the permits or registrations of a program within the department that can be transferred. Forms that are available online will have the appropriate web page citation noted on the tables. Forms not available online can be obtained by contacting the program listed on the table. Again, we urge you to contact the appropriate programs for specific details on permit transfer. When you contact them, have the existing permit numbers on hand to allow ready reference.

Call the department for basic information about permitting. If you need multiple permits, you may contact the department at 800-361-4827 to assist in arranging a one-stop pre-application meeting. For a map and list of the department’s regional offices is available online or contact the Division of Environmental Quality at 800-361-4827.

Permits are a necessary part of the environmental business because it is your first and best opportunity at assuring environmental protection and compliance. It is the department’s goal to make the permitting process as timely, protective and cost effective as possible. If you have suggestions as to how improvements can be made we would certainly like to hear from you.

Good luck in your business and environmental endeavors.

Permit Transfer Requirement Tables

Air Permits

Transfer RequirementsConstruction PermitOperating PermitOpen Burning Permit
Permit TransferableYesYesNo
Forms and Other information RequiredLetter of NotificationLetter of Notification 
Inspection RequiredNoNo 
Public Participation RequiredNoNo 
Fees RequiredNoNo 
Transfer Time FrameUpon receipt of complete transfer informationUpon receipt of complete transfer information 
Regulation or Law10 CSR 10-6.06010 CSR 10-6.065 
Program ContactConstruction Permit Unit: 573-751-4817Operating Permit Unit: 573-751-4817Local Regional Office
For More InformationAir Construction PermitsAir Operating PermitsOpen Burning

 

Dam and Safety Permits

Transfer RequirementsDam and Reservoir Safety Permits
Permit TransferableYes
Forms and Other information RequiredLetter of Notification requested
Inspection RequiredNo
Public Participation RequiredNo
Fees RequiredNo
Transfer Time FrameImmediately upon receipt of request to transfer from the seller to the buyer.
Regulation or Law10 CSR 22-2.090
Program ContactDame and Reservoir Safety: 573-368-2175
For More InformationDam and Reservoir Safety Permitting

Hazardous Waste-Related Permits

Transfer RequirementsHazardous Waste Management FacilityPCB Facility PermitHazardous Waste Generator RegistrationHazardous Waste Transporter License
Permit TransferableYesYesYesNo
Forms and Other information RequiredViolation history and financial assurance. 
Inspection RequiredNoNoNo 
Public Participation RequiredFacility must notify individuals on the facility mailing list.Facility must notify individuals on the facility mailing list.No 
Fees RequiredNoNo$100 registration fee for new registrations or reactivation 
Transfer Time Frame90 days before change90 days before changeSeven days 
Regulation or Law10 CSR 25-7.270
40 CFR 270.40
10 CSR 25-7.270
40 CFR 270.40
10 CSR 25-5.262 
Program ContactEngineering Unit: 573-751-5401Engineering Unit: 573-751-5401C&E Unit: 573-751-5401 
NotesClass 1 permit modification with prior director approvalClass 1 permit modification with prior director approval  
For More InformationHazardous Waste-Related PermitsHazardous Waste-Related PermitsHazardous Waste Generator RegistrationHazardous Waste Transporter License

Solid Waste-Related Permits

Transfer RequirementsSolid Waste Disposal Area PermitSolid Waste Processing Facility PermitInfectious Waste Processing Facility PermitScrap Tire Processing Facility PermitScrap Tire Hauler Permit
Permit TransferableYesYesYesNoNo
Forms and Other information Required
  • Information on transfer of ownership
  • Violation Disclosure Statement
  • Updated Operation and Design Plans
  • Financial Assurance Instrument
  • Information on transfer of ownership
  • Violation Disclosure Statement
  • Updated Operation and Design Plans
  • Information on transfer of ownership
  • Violation Disclosure Statement
  • Updated Operation and Design Plans
  
Inspection RequiredNoNoNo  
Public Participation RequiredNoNoNo  
Fees RequiredNoNoNo  
Transfer Time Frame6 months6 months6 months  
Regulation or LawSection 260.205.17, RSMoSection 260.205.17, RSMoSection 260.205.17, RSMo  
Program ContactEngineering Unit: 573-751-5401Engineering Unit: 573-751-5401Engineering Unit: 573-751-5401C&E Unit: 573-751-5401MoDOT, Motor Carrier Services Unit: 573-751-3358
For More InformationSolid Waste Landfill PermitsSolid Waste Processing Facility PermitsInfectious (Hazardous) Waste Transporter LicenseScrap Tire Processing Facility PermitScrap Tire Hauler Permit

Water Pollution-Related Permits

Transfer RequirementsWastewater General PermitWastewater Construction PermitWastewater Operating Permit404/ 401 Certification
Permit TransferableYes
(MORA and MOR100 are not transferable)
YesYes 
Forms and Other information Required 
Inspection RequiredNoNoNo 
Public Participation RequiredNoNoNo 
Fees RequiredYesYesYes 
Transfer Time FrameLess than one monthLess than one monthLess than one month 
Regulation or LawSection 644.051.9, RSMoSection 644.051.9, RSMoSection 644.051.9, RSMo 
Program ContactLocal Regional OfficeEngineering Section: 573-751-1300Operating Permits Section: 573-751-1300Operating Permits Section: 573-751-1300
For More InformationWastewater Permits, Stormwater PermitsWastewater Construction PermitsWastewater Permits, Stormwater PermitsSection 401 Water Quality Certification

Nothing in this document may be used to implement any enforcement action or levy any penalty unless promulgated by rule under chapter 536 or authorized by statute.


For more information